Polyurethane Ribbon Cast casting machine System for Roller Manufacturing without the Mold tools
Latest state-of-the art polyurethane casting machine for industrial rollers
2. How to Prepare and Preheat Coating Rolls
(1) Rolls should be cleaned and checked for foreign matter and oil on the roll surface before applying the adhesive.
(2) Apply 1 coat of glue and then apply another coat when dry.
(3) Once the glue is applied, attach the edge extensions to the roll.
(4) After preheating, the rolls are coated when the iron core temperature drops to (60~70℃) after checking the surface
Pre-bake in a 110℃ oven for 5-6 hours.
Ribbon Coating Job Standards
3H/110℃(3 days or more at room temperature)
(1) Unlike the existing TDI-Prepolymer, the polythene raw material is MDI-Prepolymer.
(2) In particular, MDI is considerably more sensitive and reactive to moisture than TDI, so careful handling is required.
(3) Even when adding preheated raw materials to the tank, the raw material inlet is not opened and the inlet is sealed.
1. How to Work with Raw Materials
1-1 Preparing Raw Materials
(1) Pre-heat the polythene substrate and curing agent drum in an electric oven.
(2) The heating temperature is 45℃ for 10 hours preheating.
(3) It's a good idea to preheat the hardener drum by rotating it.
(3) It should be aged at room temperature for at least a week to achieve optimal properti
Hot Tags: ribbon flow pouring machine, China, suppliers, manufacturers, factory, wholesale, buy, cheap, bulk, customized, low price, in stock, free sample, made in China, Vulcanizing Working Table, Two Colours Precision Sole Forming Machine, Continuous Flow Centrifuge, TPU Thermoplastic Elastomer Casting Machine, polyurethane foam, Foam Roller Press Machine